Sat 28th July

Too much wind and too many showers, so no flying.

Various jobs in the hangars: Kevin fixed CMN main wheel, Xtophe bought oil for the various vehicules, Seb and Owen removed the faulty winch starter engine and tried various fixes and then tried to weld the tail attachment to the K8 trailer. No joy so a new part was fabricated and then welded. Alan P fixed the guttering on 970 hanger. Gavin S fettled 662 trailer.

Posted in Flying.